Sunday, 3 April 2011

Bow thruster leg FITS
Stb prop ON!
Port prop and anode ON!!
They both FIT !!
Contra-rotating props.
Here we go again - right size hole in the right place for the right size bow thruster leg!
Looks good!
Bolt holes and gasket to secure it all together.
It FITS !!!
Hydraulic motor and cage fitted.
Here we go again - drilling the correct size hole for the correct size (at last) bow thruster leg.

Quite the piece of kit - hydraulic driven, contra-rotating props.

it's IN !!!!
Running free as the wind !!
Tied off so it doesn't slice my head off - went up fairly easily .
Finally received the new re-furbished windvane.Went up fairly easily - the ladder stayed put this time!

Saturday, 26 March 2011


Air intake ducts for the engine room.Will guide fresh air from the dorades on deck,insdie the aft heads and then into the rear of the engine room.Next job is to fit them!

View of the bunk matress set up in the aft cabin - Maple sprung slats,a layer of foam AND 2" of memory foam on top ......pure decadence!!
Motor cage location.
Well, at last I have been able to get the new rolled plate welded into place.Next step is to drill the holes for the bow thruster (again!).

Sunday, 20 February 2011



The Bowthruster guys have at last sent us the correct bowthruster leg and after the third attempt - the correct props !

So we have had to cut out a piece of the tunnel with the old , larger, wrong size holes and replace with a new piece of rolled 10mm steel plate.

This has yet to be welded in place - then the new holes drilled for the correct leg!!

Onwards..... and upwards !!!!
Well - not a lot has happened - we are still awaiting the arrival of the new portacabin for our workshop ! Not so much the cabin - but the access road !

Sunday, 9 January 2011


Also the new taps (faucets to all you yanks!!LOL!!) in the galley. Hot and cold running water - woohoo!!

Just a little progress while I'm on my own - new shower mixer and tray - and all the relevent plumbing you can't see!! Works real well.