The portacabin has finally arrived after 3 months of negotiating with the Vinci BBC construction site opposite the boatyard, to allow the truck through their site! It took quite a while to persuade them to lay me a ramp down to the boatyard level (about 50cm drop) so the low-loader could make it!
Lots of work inside now, partitions to come down and double doors put in - but overall good condition - it's going to make a grrrrreat workshop !!
Lots of work inside now, partitions to come down and double doors put in - but overall good condition - it's going to make a grrrrreat workshop !!

Sunday, 3 April 2011
Saturday, 26 March 2011
Sunday, 20 February 2011


The Bowthruster guys have at last sent us the correct bowthruster leg and after the third attempt - the correct props !
So we have had to cut out a piece of the tunnel with the old , larger, wrong size holes and replace with a new piece of rolled 10mm steel plate.
This has yet to be welded in place - then the new holes drilled for the correct leg!!
Onwards..... and upwards !!!!