Friday, 3 September 2010
Sunday, 22 August 2010
Sunday, 8 August 2010
75% of hull sanded - almost there!
We fitted the new washing machine - quite a job- a little trickier than in the kitchen... and 30" off the floor (sole!).
The drier was far easier though.
Also fitted the saloon fan heater and the bass speaker - the start of our integrated suround sound system !!! The Reflex horn is yet to be fitted.
The glue finally arrived ! So we managed to glue another two scarphs this weekend. That makes the four, square corner pieces for the main mast complete.
Next to sort the timber out for the fore and aft pieces` and scarph them.Then the port and st'b timber boards and scarph them.
After that plane and square edge ALL the scarphed board lengths ready for shaping the mast tapers.
Saturday, 31 July 2010
No new pics for this weekend - lots of work accomplished but.....same ol' stuff !
Hull sanding is coming along fine,
Seating area sole bolted down permanently - ready for the seating framework.
FOUR more mast scarphs sawn and faced off .... but the glue didn't turn up in Friday :-(
so we couldn't glue the last remaining corner posts for the main mast.
Not to worry - they will be done during next week fer sure!
Fridge interior arrived and was test fitted to make sure it was just right - that's been taken back now to fit the shelves,etc.The ply outside carcass (fridge) and compressor are all ready in the galley.
The last two battery main cables are fitted, ready for the last two batteries to complete the bank.
Hull sanding is coming along fine,
Seating area sole bolted down permanently - ready for the seating framework.
FOUR more mast scarphs sawn and faced off .... but the glue didn't turn up in Friday :-(
so we couldn't glue the last remaining corner posts for the main mast.
Not to worry - they will be done during next week fer sure!
Fridge interior arrived and was test fitted to make sure it was just right - that's been taken back now to fit the shelves,etc.The ply outside carcass (fridge) and compressor are all ready in the galley.
The last two battery main cables are fitted, ready for the last two batteries to complete the bank.
Sunday, 25 July 2010
More scarphs!
The shed's never long enough !!
Facing off the rough saw cut with the router and sliding jig.
Two more scarphs
And - another two!
Two more complete pairs of scarphs have been cut and faced off with the router and jig.More resorcinol glue will be with us next week (after payday!!)During the week we will cut the last two scarphs which will complete the four corner posts.Next will be to saw and plane these to the finshed sizes.
The fore,aft and side planks will be next to scarph.
Subscribe to:
Posts (Atom)