Tuesday 9 September 2008

9th September 08




Jim mounted and plumbed in the radiator for the forward cabin, as well as linking up the heating pipes for the 2 main cabins. Jack and Dave cut out the steel plates and the plates to constuct plinth for the air con pump in the engine room, cut some supports for the washing machine ready to be welded, levelled up the frame for the dryer and made some supports to keep it level and finally linked up the last of the rudder assembly and made the rudder stops which are also ready to be welded.

No comments: