Tuesday 7 April 2009

Starboard double cabin with the timber and ply cleats ready for the decor teak ply to be added,covering the joints will be teak pillars,etc
Dylan Roi ( France) has joined us to help move things along.Dylan is a Med student - so his time is precious and his help invaluable !


Deep sea seal on the prop shaft with it's water lubricating supply(coming up from the bottom right T joint) and anti-syphon escape tube(coming from the seal down to the bottom right)The tube traveling along the bottom from the T joint is the seawter supply to the Cutlass bearing.On the shaft itself is the anti-galvanic corrosion carbon brush gismo - this will protect the shaft and prop from galv corr from the sea water.

Foc's'l cabin,collision bulkhead on the left and ply cleats ready for the decorative addition of teak ceiling strips.




Scott ( USA) with us for a short while - clamping the hydraulic supply,return and control pipes to power the bow thruster and windlass.



No comments: